AASHTO TF28-1

$20.00

Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications

Published by Publication Date Number of Pages
AASHTO 01/01/1990 56
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

AASHTO TF28-1 – Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications

Contains the following subsections:

  • Guidelines for Usage of Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
  • Guide Specification for Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
  • Guidelines for Use of Fly Ash for In-Place Subgrade Soil Modification,
  • and General Contract Specifications for Acceptance of Fly Ash by a State Highway Agency.

Product Details

Published:
01/01/1990
Number of Pages:
56
File Size:
1 file , 2.3 MB
Note:
This product is unavailable in Russia, Belarus