CGA H-11

$49.00

Safe Startup and Shutdown Practices for Steam Reformers, Second Edition

Published by Publication Date Number of Pages
CGA 05/20/2020 19
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

CGA H-11 – Safe Startup and Shutdown Practices for Steam Reformers, Second Edition

CGA H-11 applies to steam reformers that are operated with natural gas, refinery off gas, naphtha, and other light hydrocarbon streams. It specifically applies to large volume hydrogen production plants, defined for this publication as a production capacity of 380 000 scfh (10 000 Nm3h) (9 MMSCFD or 240 000 Nm3D) or greater. This publication may be applied to smaller reformers depending on the technology used.

This publication covers operational safety of steam reformer startup and shutdown. Emphasis is placed on operational guidance and features that provide safeguards against the hazards associated with the transition and infrequent nature of startups and shutdowns. The publication is not intended to address the details of design, installation, construction, and initial startup (commissioning) of steam reformers.

Product Details

Edition:
2nd
Published:
05/20/2020
Number of Pages:
19
File Size:
1 file , 1 MB
Note:
This product is unavailable in Russia, Ukraine, Belarus