API RP 95F

$84.00

Interim Guidance for Gulf of Mexico MODU Mooring Practice-2006 Hurricane Season, First Edition
standard by American Petroleum Institute, 05/01/2006

PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

Description

This recommended practice supplements API RP 2SK for Gulf Of Mexico MODU mooring design and operation practice during the hurricane season. Topics addressed herein that will be part of the overall mooring design and MODU operations include:

  • Site and well-specific data
  • Design criteria for the mooring
  • Indicative GOM hurricane extreme metocean conditions
  • Mooring analysis
  • Site-specific risk assessment and mitigation
  • Mooring hardware issues such as anchor system and mooring system upgrade
  • Mooring operation issues such as deployment, hurricane preparedness, and inspection

Product Details

Edition:
1st
Published:
05/01/2006
Number of Pages:
39
File Size:
1 file , 740 KB
Product Code(s):
G95F01, G95F01, G95F01
Note:
This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran