ASME ANS RA-S-1.1

Original price was: $610.00.Current price is: $366.00.

Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications

Published by Publication Date Number of Pages
ASME 05/31/2022 15
PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

ASME ANS RA-S-1.1 – Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications

This Standard states requirements for a Level 1 PRA of internal and external hazards while at-power for the evaluation of core damage frequency (CDF). In addition, this Standard states requirements for a limited Level 2 PRA sufficient to evaluate large early release frequency (LERF). The only hazards explicitly excluded from the scope are accidents resulting from purposeful human-induced security threats (e.g., sabotage, terrorism). These requirements are written for operating LWR power plants (i.e., plants with designs and features similar to the plants operating when this Standard was published). They may be used for LWR plants under design or construction or for advanced LWRs, but revised or additional requirements may be needed.

Product Details

Published:
05/31/2022
Number of Pages:
402
File Size:
1 file , 2.2 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus