IEC 61850-7-410 Ed. 2.0 b:2012
$235.00
Communication networks and systems for power utility automation – Part 7-410: Basic communication structure – Hydroelectric power plants – Communication for monitoring and control
standard by International Electrotechnical Commission, 10/30/2012
Description
IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
– the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
– the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
– most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
Product Details
- Edition:
- 2.0
- Published:
- 10/30/2012
- Number of Pages:
- 122
- File Size:
- 1 file , 1.2 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus